Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
7240 S JILL PL
Address NEW:
7240 S JILL PL
Apply Date:
08/24/2026
Applicant:
ANGEL MORALES
Description:
P.360535B Overbuild: Bore 4321' and trench 175' to place conduit and fiber cable Place 548' of aerial fiber cable Place 57 pedestals/cabinets/vaults

Permit Reviews

Permit Number - TR-UTL-0826-01424
Permit Status: Fees due
Permit Description: P.360535B Overbuild: Bore 4321' and trench 175' to place conduit and fiber cable Place 548' of aerial fiber cable Place 57 pedestals/cabinets/vaults
Start Date Submittal Complete Date Status  
08/25/2026 RIGHT-OF-WAY REVIEW v.1 09/14/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01424
Permit Status: Fees due
Permit Description: P.360535B Overbuild: Bore 4321' and trench 175' to place conduit and fiber cable Place 548' of aerial fiber cable Place 57 pedestals/cabinets/vaults
Total Outstanding Activity Conditions - 4
Date Name
08/27/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
08/27/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
08/27/2026 Traffic control set-up approved between 9AM - 3:30PM
09/14/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.