Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1801 E Speedway BL
Apply Date:
08/24/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X10 HOLE IN DIRT ROW IN ORDER TO ABANDON A SECTION OF MAIN - 90DAYS - ARIZONA PIPELINE WILL BE WORKING 3 OF THE 90DAYS - TRAFFIC CONTOL WILL BE UP 3 OUT OF THE 90DAYS -

Permit Reviews

Permit Number - TR-UTL-0826-01422
Permit Status: Issued
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X10 HOLE IN DIRT ROW IN ORDER TO ABANDON A SECTION OF MAIN - 90DAYS - ARIZONA PIPELINE WILL BE WORKING 3 OF THE 90DAYS - TRAFFIC CONTOL WILL BE UP 3 OUT OF THE 90DAYS -
Start Date Submittal Complete Date Status  
08/24/2026 RIGHT-OF-WAY REVIEW v.1 09/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01422
Permit Status: Issued
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X10 HOLE IN DIRT ROW IN ORDER TO ABANDON A SECTION OF MAIN - 90DAYS - ARIZONA PIPELINE WILL BE WORKING 3 OF THE 90DAYS - TRAFFIC CONTOL WILL BE UP 3 OUT OF THE 90DAYS -
Total Outstanding Activity Conditions - 4
Date Name
08/24/2026 Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell.
08/24/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
08/24/2026 Traffic control set-up approved between 9AM - 3:30PM
08/24/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW