Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
6300 E TANQUE VERDE RD
Apply Date:
08/21/2026
Applicant:
Brittany West
Description:
Boring 2- 2" conduits for a total or 5330' at a depth of 36" and installing new aireal strand and fiber for a total of 5080' and installing a 432 count fiber for the whole project.

Permit Reviews

Permit Number - TR-UTL-0826-01412
Permit Status: Needs resubmittal
Permit Description: Boring 2- 2" conduits for a total or 5330' at a depth of 36" and installing new aireal strand and fiber for a total of 5080' and installing a 432 count fiber for the whole project.
Start Date Submittal Complete Date Status  
08/21/2026 RIGHT-OF-WAY REVIEW v.1 09/11/2026 REQUIRES RESUBMIT Review Details
09/16/2026 RIGHT-OF-WAY REVIEW v.2 09/16/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01412
Permit Status: Needs resubmittal
Permit Description: Boring 2- 2" conduits for a total or 5330' at a depth of 36" and installing new aireal strand and fiber for a total of 5080' and installing a 432 count fiber for the whole project.
Total Outstanding Activity Conditions - 6
Date Name
08/26/2026 CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
08/26/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from November 26, 2026 to January 04, 2027. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.
08/26/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/26/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/26/2026 Traffic control set-up approved between 9AM - 3:30PM
08/26/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.