Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
1127 N 6TH AV
Address NEW:
1127 N 6TH AV
Apply Date:
08/21/2026
Applicant:
Brittany West
Description:
Boring 2- 2" conduits for a total or 3284' at a depth of 36" and installing new aireal strand and fiber for a total of 2675' and installing a 432 count fiber for the whole project.

Permit Reviews

Permit Number - TR-UTL-0826-01411
Permit Status: Needs resubmittal
Permit Description: Boring 2- 2" conduits for a total or 3284' at a depth of 36" and installing new aireal strand and fiber for a total of 2675' and installing a 432 count fiber for the whole project.
Start Date Submittal Complete Date Status  
08/21/2026 RIGHT-OF-WAY REVIEW v.1 08/25/2026 REQUIRES RESUBMIT Review Details
08/27/2026 RIGHT-OF-WAY REVIEW v.2 09/15/2026 REQUIRES RESUBMIT Review Details
10/16/2026 RIGHT-OF-WAY REVIEW v.3 10/19/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01411
Permit Status: Needs resubmittal
Permit Description: Boring 2- 2" conduits for a total or 3284' at a depth of 36" and installing new aireal strand and fiber for a total of 2675' and installing a 432 count fiber for the whole project.
Total Outstanding Activity Conditions - 6
Date Name
08/25/2026 CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
08/25/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/25/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/25/2026 Traffic control set-up approved between 9AM - 3:30PM
08/25/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/25/2026 ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL