Permit: TR-UTL-0826-01401
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4244 E KINGS RD
Address NEW:
4244 E KINGS RD
Apply Date:
08/20/2026
Applicant:
Angeline Trejo
Description:
Cut asphalt and trench 22’ & place innerduct; trench in dirt 48’ and place innerduct; place one HH; access one MH for placing and splicing fiber cable. This project is for Lumen and will not be conveyed to any other company
Permit Reviews
Permit Number - TR-UTL-0826-01401
Permit Status: Inspections
Permit Description: Cut asphalt and trench 22’ & place innerduct; trench in dirt 48’ and place innerduct; place one HH; access one MH for placing and splicing fiber cable.
This project is for Lumen and will not be conveyed to any other company
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/21/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01401
Permit Status: Inspections
Permit Description: Cut asphalt and trench 22’ & place innerduct; trench in dirt 48’ and place innerduct; place one HH; access one MH for placing and splicing fiber cable.
This project is for Lumen and will not be conveyed to any other company
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/21/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/21/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/21/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0826-01401
Permit Description: Cut asphalt and trench 22’ & place innerduct; trench in dirt 48’ and place innerduct; place one HH; access one MH for placing and splicing fiber cable.
This project is for Lumen and will not be conveyed to any other company
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |