Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address NEW:
9444 E GOLF LINKS RD
Apply Date:
08/19/2026
Applicant:
Cox Communications
Description:
PRJ319143-1: Cox to proof/ pull thru 50' of existing CATV conduit onto private property for system tie.

Permit Reviews

Permit Number - TR-UTL-0826-01395
Permit Status: In review
Permit Description: PRJ319143-1: Cox to proof/ pull thru 50' of existing CATV conduit onto private property for system tie.
Start Date Submittal Complete Date Status  
08/19/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01395
Permit Status: In review
Permit Description: PRJ319143-1: Cox to proof/ pull thru 50' of existing CATV conduit onto private property for system tie.
Total Outstanding Activity Conditions - 7
Date Name
08/20/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/20/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
08/20/2026 Traffic control set-up approved between 9AM - 3:30PM
08/20/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/20/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/20/2026 Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
08/20/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.