Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4002 N PARK AV
Address NEW:
4002 N PARK AV
Apply Date:
08/19/2026
Applicant:
Brittany West
Description:
trench along proposed path for 100ft at a depth of 36inches. replace 1 ped.

Permit Reviews

Permit Number - TR-UTL-0826-01391
Permit Status: Inspections
Permit Description: trench along proposed path for 100ft at a depth of 36inches. replace 1 ped.
Start Date Submittal Complete Date Status  
08/19/2026 RIGHT-OF-WAY REVIEW v.1 08/25/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01391
Permit Status: Inspections
Permit Description: trench along proposed path for 100ft at a depth of 36inches. replace 1 ped.
Total Outstanding Activity Conditions - 5
Date Name
08/20/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
08/20/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
08/20/2026 Excavation - All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift
08/20/2026 Roger Rd is under a pavement moratorium. Any disturbance of existing asphalt shall require a 2-inch mill and overlay for a minimum of 25 feet in each direction from the outside edge of the cut, across all affected travel lanes.
08/20/2026 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0826-01391
Permit Description: trench along proposed path for 100ft at a depth of 36inches. replace 1 ped.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/02/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed they should only be digging in the alleyway they should be in and out in two days

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DESIGN PLAN-JB0002413618_PERMIT MAP-C1_V1.PDF DOCUMENTS VIEW
ENGINEERING DRAFT_V1.PDF DOCUMENTS VIEW
TCP_V1.PDF DOCUMENTS VIEW