Permit: TR-UTL-0826-01378
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4611 N ORACLE RD
Address NEW:
4611 N ORACLE RD
Apply Date:
08/18/2026
Applicant:
Kristine Schwartz
Description:
No excavation will be occurring. SWG crews need to clean debris out of valve box located on Auto Mall Dr, and need to set up traffic control for safety.
Permit Reviews
Permit Number - TR-UTL-0826-01378
Permit Status: Inspections
Permit Description: No excavation will be occurring.
SWG crews need to clean debris out of valve box located on Auto Mall Dr, and need to set up traffic control for safety.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/20/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01378
Permit Status: Inspections
Permit Description: No excavation will be occurring.
SWG crews need to clean debris out of valve box located on Auto Mall Dr, and need to set up traffic control for safety.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/20/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/20/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/20/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/20/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0826-01378
Permit Description: No excavation will be occurring.
SWG crews need to clean debris out of valve box located on Auto Mall Dr, and need to set up traffic control for safety.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Precon held on site Southwest gas will get back to me when scheduling occurs for this job |