Permit: TR-UTL-0826-01362
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2927 E CALLE RABIDA
Address NEW:
2927 E CALLE RABIDA
Apply Date:
08/17/2026
Applicant:
Description:
wo# 3339946 2927 E Calle Rabida 15 14 05 SE service renewal in front of lot south east side in asphalt 6LF/QL
Permit Reviews
Permit Number - TR-UTL-0826-01362
Permit Status: Issued
Permit Description: wo# 3339946 2927 E Calle Rabida 15 14 05 SE service renewal in front of lot south east side in asphalt 6LF/QL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/31/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01362
Permit Status: Issued
Permit Description: wo# 3339946 2927 E Calle Rabida 15 14 05 SE service renewal in front of lot south east side in asphalt 6LF/QL
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/18/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/18/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 08/31/2026 | Excavation - All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift |
| 08/31/2026 | Neighborhood work - The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
| 08/31/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |