Permit: TR-UTL-0826-01337
Permit Details
Status:
Withdrawn
Type:
Right-of-Way (ROW) - Utility
Address:
170 S HOUGHTON RD
Address NEW:
170 S HOUGHTON RD
Apply Date:
08/12/2026
Applicant:
Description:
wo# 3346485 170 S Houghton Rd 14 15 14 NE install new service line south east side of lot in asphalt 8LF/QL 08/19/2026 - Withdrawn as of 08/19/2026
Permit Reviews
Permit Number - TR-UTL-0826-01337
Permit Status: Withdrawn
Permit Description: wo# 3346485 170 S Houghton Rd 14 15 14 NE install new service line south east side of lot in asphalt 8LF/QL
08/19/2026 - Withdrawn as of 08/19/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/12/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/17/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01337
Permit Status: Withdrawn
Permit Description: wo# 3346485 170 S Houghton Rd 14 15 14 NE install new service line south east side of lot in asphalt 8LF/QL
08/19/2026 - Withdrawn as of 08/19/2026
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/17/2026 | CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 08/17/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/17/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/17/2026 | Traffic control set-up approved between 9AM - 3:30PM |