Permit Details

Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2942 E 23RD ST
Address NEW:
2942 E 23RD ST
Apply Date:
08/05/2026
Applicant:
luis granillo
Description:
WO# 3339925 2942 E 23rd St 14 14 20 NE service repair north of lot in front in asphalt. 4LF/QL

Permit Reviews

Permit Number - TR-UTL-0826-01297
Permit Status: Inspections complete
Permit Description: WO# 3339925 2942 E 23rd St 14 14 20 NE service repair north of lot in front in asphalt. 4LF/QL
Start Date Submittal Complete Date Status  
08/05/2026 RIGHT-OF-WAY REVIEW v.1 08/24/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01297
Permit Status: Inspections complete
Permit Description: WO# 3339925 2942 E 23rd St 14 14 20 NE service repair north of lot in front in asphalt. 4LF/QL
Total Outstanding Activity Conditions - 6
Date Name
08/06/2026 Traffic Control set-up approved between 7AM - 5PM
08/06/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/06/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/24/2026 Excavation - All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift
08/24/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary
08/24/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TR-UTL-0826-01297
Permit Description: WO# 3339925 2942 E 23rd St 14 14 20 NE service repair north of lot in front in asphalt. 4LF/QL
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/21/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete
10/21/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete
10/21/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
10/21/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
2942 E 23RD ST_SKETCH_V1.PDF DOCUMENTS VIEW