Permit: TR-UTL-0826-01296
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
2121 S WINSTEL AV
Address NEW:
2121 S WINSTEL AV
Apply Date:
08/05/2026
Applicant:
Tucson Water
Description:
WO# 3332513 2121 S Winstel Rd 14 14 21 SE replace curb stop west side of lot in rear easement in concrete - 8LF/AL
Permit Reviews
Permit Number - TR-UTL-0826-01296
Permit Status: Needs resubmittal
Permit Description: WO# 3332513 2121 S Winstel Rd 14 14 21 SE replace curb stop west side of lot in rear easement in concrete - 8LF/AL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/03/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01296
Permit Status: Needs resubmittal
Permit Description: WO# 3332513 2121 S Winstel Rd 14 14 21 SE replace curb stop west side of lot in rear easement in concrete - 8LF/AL
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/07/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 08/07/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/07/2026 | A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES |
| 08/07/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/07/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |