Permit: TR-UTL-0826-01291
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
7511 E LURLENE DR
Address NEW:
7511 E LURLENE DR
Apply Date:
08/04/2026
Applicant:
ANGEL MORALES
Description:
P.092663C Overbuild BORE 3459' AND TRENCH 384' TO PLACE CONDUIT AND FIBER CABLE PLACE 550' OF AERIAL FIBER CABLE PLACE 11 PEDESTALS AND 38 HAND HOLES This is to replace TR-UTL-0226-00349 which expired before work could begin
Permit Reviews
Permit Number - TR-UTL-0826-01291
Permit Status: Needs resubmittal
Permit Description: P.092663C Overbuild
BORE 3459' AND TRENCH 384' TO PLACE CONDUIT AND FIBER CABLE
PLACE 550' OF AERIAL FIBER CABLE
PLACE 11 PEDESTALS AND 38 HAND HOLES
This is to replace TR-UTL-0226-00349 which expired before work could begin
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/18/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01291
Permit Status: Needs resubmittal
Permit Description: P.092663C Overbuild
BORE 3459' AND TRENCH 384' TO PLACE CONDUIT AND FIBER CABLE
PLACE 550' OF AERIAL FIBER CABLE
PLACE 11 PEDESTALS AND 38 HAND HOLES
This is to replace TR-UTL-0226-00349 which expired before work could begin
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/06/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 08/06/2026 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 23rd to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show. |
| 08/06/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/06/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/06/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/06/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |