Permit: TR-UTL-0826-01286
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
1349 N 5TH AV
Address NEW:
1349 N 5TH AV
Apply Date:
08/03/2026
Applicant:
Aidan Willis
Description:
Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 5,258 LF along City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF for future maintenance and access.
Permit Reviews
Permit Number - TR-UTL-0826-01286
Permit Status: Needs resubmittal
Permit Description: Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 5,258 LF along City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF for future maintenance and access.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/03/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/05/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01286
Permit Status: Needs resubmittal
Permit Description: Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 5,258 LF along City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF for future maintenance and access.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/04/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/04/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 08/04/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/04/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |