Permit: TR-UTL-0826-01281
Permit Details
Apply Date:
08/03/2026
Applicant:
Cox Communications
Description:
PRJ320223-1: Cox to overlash 786' of CATV fiber & bore 16' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0826-01281
Permit Status: Issued
Permit Description: PRJ320223-1: Cox to overlash 786' of CATV fiber & bore 16' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/24/2026 | APPROVED |
| 08/03/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/13/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01281
Permit Status: Issued
Permit Description: PRJ320223-1: Cox to overlash 786' of CATV fiber & bore 16' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 08/03/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/03/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/03/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/03/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/03/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/03/2026 | Sidewalk Closer PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 08/24/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |