Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
3233 N 1ST AV
Address NEW:
3233 N 1ST AV
Apply Date:
08/03/2026
Applicant:
Cox Communications
Description:
PRJ320223-1: Cox to overlash 786' of CATV fiber & bore 16' to install new CATV conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-0826-01281
Permit Status: Issued
Permit Description: PRJ320223-1: Cox to overlash 786' of CATV fiber & bore 16' to install new CATV conduit for system tie.
Start Date Submittal Complete Date Status  
08/21/2026 RIGHT-OF-WAY REVIEW v.2 08/24/2026 APPROVED Review Details
08/03/2026 RIGHT-OF-WAY REVIEW v.1 08/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01281
Permit Status: Issued
Permit Description: PRJ320223-1: Cox to overlash 786' of CATV fiber & bore 16' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 7
Date Name
08/03/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/03/2026 Traffic control set-up approved between 9AM - 3:30PM
08/03/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/03/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/03/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/03/2026 Sidewalk Closer PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
08/24/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ320223-1 REV TCP_V2.PDF DOCUMENTS VIEW
PRJ320223-1 TUCSON_V1.PDF DOCUMENTS VIEW