Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
823 E SPEEDWAY BL
Apply Date:
08/03/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 8'X2' TRENCH IN SIDEWALK ROW AND 1 3'X3' BELL HOLE IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE * ARIZONA PIEPLIEN WILL WORK IN ROW FOR APPROX 5 DAYS8ARIZONA PIPELINE WILL NEED A 90 DAY PERMIT IN ORDER TO COMPLETE THIS WORK ODER

Permit Reviews

Permit Number - TR-UTL-0826-01280
Permit Status: Needs resubmittal
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 8'X2' TRENCH IN SIDEWALK ROW AND 1 3'X3' BELL HOLE IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE * ARIZONA PIEPLIEN WILL WORK IN ROW FOR APPROX 5 DAYS8ARIZONA PIPELINE WILL NEED A 90 DAY PERMIT IN ORDER TO COMPLETE THIS WORK ODER
Start Date Submittal Complete Date Status  
08/03/2026 RIGHT-OF-WAY REVIEW v.1 08/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01280
Permit Status: Needs resubmittal
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 8'X2' TRENCH IN SIDEWALK ROW AND 1 3'X3' BELL HOLE IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE * ARIZONA PIEPLIEN WILL WORK IN ROW FOR APPROX 5 DAYS8ARIZONA PIPELINE WILL NEED A 90 DAY PERMIT IN ORDER TO COMPLETE THIS WORK ODER
Total Outstanding Activity Conditions - 5
Date Name
08/03/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/03/2026 Traffic control set-up approved between 9AM - 3:30PM
08/03/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/03/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/03/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.