Permit: TR-UTL-0825-01465
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
812 W ACADIA DR
Address NEW:
812 W ACADIA DR
Apply Date:
08/29/2025
Applicant:
Tucson Electric Power
Description:
AFTER-THE-FACT. WO T157274. TEP Replace (10) 1Ph Pad-Mount Transformers. Installed (1) J1 cabinet. Installed (2) 2.5” primary risers & conduit to existing transformer. Emergency project due to low voltage and outages.
Permit Reviews
Permit Number - TR-UTL-0825-01465
Permit Status: Complete
Permit Description: AFTER-THE-FACT. WO T157274. TEP Replace (10) 1Ph Pad-Mount Transformers. Installed (1) J1 cabinet.
Installed (2) 2.5” primary risers & conduit to existing transformer. Emergency project due to low voltage and outages.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/02/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01465
Permit Status: Complete
Permit Description: AFTER-THE-FACT. WO T157274. TEP Replace (10) 1Ph Pad-Mount Transformers. Installed (1) J1 cabinet.
Installed (2) 2.5” primary risers & conduit to existing transformer. Emergency project due to low voltage and outages.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/02/2025 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/02/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01465
Permit Description: AFTER-THE-FACT. WO T157274. TEP Replace (10) 1Ph Pad-Mount Transformers. Installed (1) J1 cabinet.
Installed (2) 2.5” primary risers & conduit to existing transformer. Emergency project due to low voltage and outages.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2025 | TRSP - ROW - Final | Passed |