Permit: TR-UTL-0825-01459
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
205 W ARAGON RD
Address NEW:
205 W ARAGON RD
Apply Date:
08/29/2025
Applicant:
Cox Communications
Description:
Trench 4' and Bore 124', place 1-2" conduit, overlash 628' fiber for CATV system tie
Permit Reviews
Permit Number - TR-UTL-0825-01459
Permit Status: Complete
Permit Description: Trench 4' and Bore 124', place 1-2" conduit, overlash 628' fiber for CATV system tie
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01459
Permit Status: Complete
Permit Description: Trench 4' and Bore 124', place 1-2" conduit, overlash 628' fiber for CATV system tie
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/29/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 08/29/2025 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES |
| 08/29/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/03/2025 | Your project work requires that you contact the SUNNYSIDE SCHOOL DISTRICT NO 12 to alert them and coordinate work as needed in school zones. |
| 09/03/2025 | Field Review Note: Proposed setup will directly impact school operations. Coordination with School Administration, Setup not to impact School operations during Drop off and Pickup. Sidewalk to remain fully accessible during school hours |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01459
Permit Description: Trench 4' and Bore 124', place 1-2" conduit, overlash 628' fiber for CATV system tie
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/18/2025 | TRSP - ROW - Final | Passed |