Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
5469 S VIA GUAYAQUIL
Apply Date:
08/27/2025
Applicant:
Chelsey Bolinger
Description:
P.169080 (KAHNA) - BORE 4,320’ & TRENCH 80’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (23) HANDHOLES & PEDESTALS.

Permit Reviews

Permit Number - TR-UTL-0825-01442
Permit Status: Complete
Permit Description: P.169080 (KAHNA) - BORE 4,320’ & TRENCH 80’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (23) HANDHOLES & PEDESTALS.
Start Date Submittal Complete Date Status  
08/28/2025 RIGHT-OF-WAY REVIEW v.1 09/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01442
Permit Status: Complete
Permit Description: P.169080 (KAHNA) - BORE 4,320’ & TRENCH 80’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (23) HANDHOLES & PEDESTALS.
Total Outstanding Activity Conditions - 4
Date Name
08/28/2025 PRE-CON/PAVEMENT/SIDEWALK
08/28/2025 Traffic Control set-up approved between 7AM - 5PM
08/28/2025 Traffic control set-up approved between 9AM - 3:30PM
08/28/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0825-01442
Permit Description: P.169080 (KAHNA) - BORE 4,320’ & TRENCH 80’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (23) HANDHOLES & PEDESTALS.
Total Completed Inspections - 6
Date Description Inspector Results Comments
10/20/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/06/2025 TRSP - ROW - SITE INSPECTION Passed
12/17/2025 TRSP - ROW - Barricade - Setup/Routine Passed
12/17/2025 TRSP - ROW - Barricade Takedown Passed
12/17/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
01/08/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.169080 AERIAL MAP_V1.PDF DOCUMENTS VIEW
P.169080_CAD_08272025_V1.PDF DOCUMENTS VIEW
P.169080_TCP_08272025_V1.PDF DOCUMENTS VIEW