Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1248 N 4TH AV
Address NEW:
1248 N 4TH AV
Apply Date:
08/26/2025
Applicant:
Rene Villalobos
Description:
wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc After the fact ** work completed on 8/23/2025

Permit Reviews

Permit Number - TR-UTL-0825-01438
Permit Status: Inspections
Permit Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc After the fact ** work completed on 8/23/2025
Start Date Submittal Complete Date Status  
04/15/2026 RIGHT-OF-WAY REVIEW v.2 N/A APPROVED Review Details
08/27/2025 RIGHT-OF-WAY REVIEW v.1 09/02/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01438
Permit Status: Inspections
Permit Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc After the fact ** work completed on 8/23/2025
Total Outstanding Activity Conditions - 2
Date Name
04/15/2026 Emergency - After the fact permit
08/27/2025 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0825-01438
Permite Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc After the fact ** work completed on 8/23/2025
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/04/2026 TRSP - ROW - Final N/A Re-inspection required Permanent patch has not been installed does not meet standard top prior to the 411

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0825-01438
Permit Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc After the fact ** work completed on 8/23/2025
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/04/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/04/2026 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
1248 N 4TH AV_SKETCH_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW