Permit: TR-UTL-0825-01438
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1248 N 4TH AV
Address NEW:
1248 N 4TH AV
Apply Date:
08/26/2025
Applicant:
Rene Villalobos
Description:
wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc After the fact ** work completed on 8/23/2025
Permit Reviews
Permit Number - TR-UTL-0825-01438
Permit Status: Inspections
Permit Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc
After the fact ** work completed on 8/23/2025
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | APPROVED |
| 08/27/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/02/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01438
Permit Status: Inspections
Permit Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc
After the fact ** work completed on 8/23/2025
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/15/2026 | Emergency - After the fact permit |
| 08/27/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0825-01438
Permite Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc
After the fact ** work completed on 8/23/2025
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2026 | TRSP - ROW - Final | N/A | Re-inspection required | Permanent patch has not been installed does not meet standard top prior to the 411 |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0825-01438
Permit Description: wo3060039 1248 n 4th av 14-13-01 se replace broken valves nw of lot in intersection of 4th av and mabel in asphalt 8LF/sc
After the fact ** work completed on 8/23/2025
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/04/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed |