Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0825-01409
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
449 S AVENIDA DE PALMAS
Address NEW:
449 S AVENIDA DE PALMAS
Apply Date:
08/22/2025
Applicant:
Description:
wo#3107759 449 s avenida de palmas 14-14-16 nw leaking service painted out in white at the front west side of the lot in the dirt and asphalt 10lf/ar
Permit Reviews
Permit Number - TR-UTL-0825-01409
Permit Status: Complete
Permit Description: wo#3107759 449 s avenida de palmas 14-14-16 nw leaking service painted out in white at the front west side of the lot in the dirt and asphalt 10lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01409
Permit Status: Complete
Permit Description: wo#3107759 449 s avenida de palmas 14-14-16 nw leaking service painted out in white at the front west side of the lot in the dirt and asphalt 10lf/ar
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/22/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 08/22/2025 | IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 08/22/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01409
Permit Description: wo#3107759 449 s avenida de palmas 14-14-16 nw leaking service painted out in white at the front west side of the lot in the dirt and asphalt 10lf/ar
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/23/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/21/2025 | TRSP - ROW - Final | Passed |