Permit: TR-UTL-0825-01405
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
925 W DISTRICT ST
Address NEW:
925 W DISTRICT ST
Apply Date:
08/21/2025
Applicant:
ANGEL MORALES
Description:
wo2952878 925 w district st 14-13-35 ne valve mantenance front of lot in asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0825-01405
Permit Status: Complete
Permit Description: wo2952878 925 w district st 14-13-35 ne valve mantenance front of lot in asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01405
Permit Status: Complete
Permit Description: wo2952878 925 w district st 14-13-35 ne valve mantenance front of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/22/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 08/25/2025 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual |
| 08/25/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/25/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01405
Permite Description: wo2952878 925 w district st 14-13-35 ne valve mantenance front of lot in asphalt 6LF/sc
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01405
Permit Description: wo2952878 925 w district st 14-13-35 ne valve mantenance front of lot in asphalt 6LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/24/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/04/2026 | TRSP - ROW - Final | Passed |