Permit: TR-UTL-0825-01402
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
117 E FORT LOWELL RD
Address NEW:
117 E FORT LOWELL RD
Apply Date:
08/21/2025
Applicant:
Cox Communications
Description:
PRJ302067-1 Cox to lash for ~250' then pull ~150' through existing conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0825-01402
Permit Status: Complete
Permit Description: PRJ302067-1 Cox to lash for ~250' then pull ~150' through existing conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2025 | RIGHT-OF-WAY REVIEW v.2 | 09/19/2025 | APPROVED |
| 08/21/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/22/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01402
Permit Status: Complete
Permit Description: PRJ302067-1 Cox to lash for ~250' then pull ~150' through existing conduit for system tie.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/21/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 08/22/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 08/22/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 08/22/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01402
Permit Description: PRJ302067-1 Cox to lash for ~250' then pull ~150' through existing conduit for system tie.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/23/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 12/23/2025 | TRSP - ROW - Final | Passed |