Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
147 W KENNEDY ST
Address NEW:
147 W KENNEDY ST
Apply Date:
08/20/2025
Applicant:
ELIU MELGOZA
Description:
P.108482.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.

Permit Reviews

Permit Number - TR-UTL-0825-01388
Permit Status: Complete
Permit Description: P.108482.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Start Date Submittal Complete Date Status  
08/20/2025 RIGHT-OF-WAY REVIEW v.1 09/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01388
Permit Status: Complete
Permit Description: P.108482.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Outstanding Activity Conditions - 3
Date Name
08/21/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
08/21/2025 Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
08/21/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0825-01388
Permit Description: P.108482.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/15/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/20/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/20/2025 TRSP - ROW - Final Passed