Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4885 S HOUGHTON RD
Apply Date:
08/20/2025
Applicant:
Al Som
Description:
N.795915/P.055381 - 3 : (PAGES 14-16 IN DESIGN PLAN) ON S HOUGHTON RD FROM E KEYSTONE DR TO IRVINGTON RD. BORE/TRENCH 3170' +,DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES & REMOVE/REPLACE ASPHALT Tucson CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte *This permit application's civil plans have been reviewed and approved by PSOMAS engineering per the City’s requirement Original permit #TR-UTL-0125-00168

Permit Reviews

Permit Number - TR-UTL-0825-01384
Permit Status: Issued
Permit Description: N.795915/P.055381 - 3 : (PAGES 14-16 IN DESIGN PLAN) ON S HOUGHTON RD FROM E KEYSTONE DR TO IRVINGTON RD. BORE/TRENCH 3170' +,DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES & REMOVE/REPLACE ASPHALT Tucson CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte *This permit application's civil plans have been reviewed and approved by PSOMAS engineering per the City’s requirement Original permit #TR-UTL-0125-00168
Start Date Submittal Complete Date Status  
08/20/2025 RIGHT-OF-WAY REVIEW v.1 08/21/2025 REQUIRES RESUBMIT Review Details
09/12/2025 RIGHT-OF-WAY REVIEW v.2 09/18/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01384
Permit Status: Issued
Permit Description: N.795915/P.055381 - 3 : (PAGES 14-16 IN DESIGN PLAN) ON S HOUGHTON RD FROM E KEYSTONE DR TO IRVINGTON RD. BORE/TRENCH 3170' +,DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES & REMOVE/REPLACE ASPHALT Tucson CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte *This permit application's civil plans have been reviewed and approved by PSOMAS engineering per the City’s requirement Original permit #TR-UTL-0125-00168
Total Outstanding Activity Conditions - 5
Date Name
08/21/2025 Your project work requires that you contact the Tucson Unified School District to alert them and coordinate work as needed in school zones.
08/21/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/21/2025 Work and Setups Effecting Golf Links or Old Spanish Trail intersections should be perform during off Hours, for Trench or Pothole Work. Location Specific Plans required for Work At Golf Links intersection
08/21/2025 Traffic control set-up approved between 9AM - 3:30PM
08/21/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
N.759915 CIVIL SHEETS 12_18_2024_PERMIT APPLICATION_V1.PDF DOCUMENTS VIEW
N.795915 SATELLITE PLAN_V1.PDF DOCUMENTS VIEW
N.795915-TCPS 1-3 REV1_V1.PDF DOCUMENTS VIEW