Permit: TR-UTL-0825-01366
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4710 E SENECA ST
Address NEW:
4710 E SENECA ST
Apply Date:
08/18/2025
Applicant:
Chelsey Bolinger
Description:
P.099179A (KAHNA) - BORE 1,038’ & TRENCH 55’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES & PEDESTALS. OVERLASH 3,239’ OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0825-01366
Permit Status: Complete
Permit Description: P.099179A (KAHNA) - BORE 1,038’ & TRENCH 55’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES & PEDESTALS. OVERLASH 3,239’ OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/02/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01366
Permit Status: Complete
Permit Description: P.099179A (KAHNA) - BORE 1,038’ & TRENCH 55’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES & PEDESTALS. OVERLASH 3,239’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/27/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 08/27/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/27/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/27/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/02/2025 | Edison St, Hampton St, Seneca st, Waverly St, Linden St, N Arcadia St, N Mountain View Av, Frances Bl, Nancy Rose Bl, Santa Rosa Av are subject to a pavement moratorium. A 2-inch mill and overlay, covering half the width of the roadway, is required. The ROW inspector will confirm the treatment required for pavement restoration at the preconstruction meeting |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01366
Permit Description: P.099179A (KAHNA) - BORE 1,038’ & TRENCH 55’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES & PEDESTALS. OVERLASH 3,239’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/03/2025 | TRSP - ROW - Final | Passed |