Permit: TR-UTL-0825-01363
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1723 N BEVERLY AV
Address NEW:
1723 N BEVERLY AV
Apply Date:
08/18/2025
Applicant:
Chelsey Bolinger
Description:
P.099102B (KAHNA) - OVERLASH 2,531' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0825-01363
Permit Status: Complete
Permit Description: P.099102B (KAHNA) - OVERLASH 2,531' OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/20/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01363
Permit Status: Complete
Permit Description: P.099102B (KAHNA) - OVERLASH 2,531' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 08/19/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 08/19/2025 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 08/19/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/19/2025 | Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 08/19/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/20/2025 | Message Board to be placed 5 days in advance of work along Arterial/Collector Right of Ways |
| 08/20/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01363
Permit Description: P.099102B (KAHNA) - OVERLASH 2,531' OF AERIAL FIBER CABLE.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/05/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/05/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 12/05/2025 | TRSP - ROW - Final | Passed |