Permit: TR-UTL-0825-01361
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5214 E PIMA ST
Address NEW:
5214 E PIMA ST
Apply Date:
08/18/2025
Applicant:
Chelsey Bolinger
Description:
P.099104B (KAHNA) - OVERLASH 4,166’ OF AERIAL FIBER CABLE. Per City of Tucson Project Manager - Project to conform to work date as discuss on phone 9/8/25- 10/04/25. (9/4/25 updated)
Permit Reviews
Permit Number - TR-UTL-0825-01361
Permit Status: Complete
Permit Description: P.099104B (KAHNA) - OVERLASH 4,166’ OF AERIAL FIBER CABLE.
Per City of Tucson Project Manager - Project to conform to work date as discuss on phone 9/8/25- 10/04/25. (9/4/25 updated)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/04/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01361
Permit Status: Complete
Permit Description: P.099104B (KAHNA) - OVERLASH 4,166’ OF AERIAL FIBER CABLE.
Per City of Tucson Project Manager - Project to conform to work date as discuss on phone 9/8/25- 10/04/25. (9/4/25 updated)
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 08/18/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 08/18/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/18/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 08/18/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 08/18/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/18/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/04/2025 | Project Work date Constraints. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01361
Permit Description: P.099104B (KAHNA) - OVERLASH 4,166’ OF AERIAL FIBER CABLE.
Per City of Tucson Project Manager - Project to conform to work date as discuss on phone 9/8/25- 10/04/25. (9/4/25 updated)
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/05/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/05/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/05/2025 | TRSP - ROW - Final | Passed |