Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3901 E GRANT RD
Address NEW:
3901 E GRANT RD
Apply Date:
08/14/2025
Applicant:
Cox Communications
Description:
PRJ299528-1 cox to trench 10' to install new conduit for system tie and overlash for 674'.

Permit Reviews

Permit Number - TR-UTL-0825-01342
Permit Status: Complete
Permit Description: PRJ299528-1 cox to trench 10' to install new conduit for system tie and overlash for 674'.
Start Date Submittal Complete Date Status  
08/14/2025 RIGHT-OF-WAY REVIEW v.1 08/15/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01342
Permit Status: Complete
Permit Description: PRJ299528-1 cox to trench 10' to install new conduit for system tie and overlash for 674'.
Total Outstanding Activity Conditions - 3
Date Name
08/14/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
08/14/2025 Traffic control set-up approved between 9AM - 3:30PM
08/15/2025 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0825-01342
Permit Description: PRJ299528-1 cox to trench 10' to install new conduit for system tie and overlash for 674'.
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/27/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/16/2025 TRSP - ROW - Barricade - Setup/Routine Passed
09/16/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
09/26/2025 TRSP - ROW - Final Passed