Permit: TR-UTL-0825-01333
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7150 E SPEEDWAY BL
Address NEW:
7150 E SPEEDWAY BL
Apply Date:
08/12/2025
Applicant:
Cox Communications
Description:
PRJ300709-1 Cox to bore 488' to install new conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0825-01333
Permit Status: Complete
Permit Description: PRJ300709-1 Cox to bore 488' to install new conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/19/2025 | RIGHT-OF-WAY REVIEW v.2 | 08/19/2025 | APPROVED |
| 08/12/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/15/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01333
Permit Status: Complete
Permit Description: PRJ300709-1 Cox to bore 488' to install new conduit for system tie.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/12/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/12/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/19/2025 | Bike Lane Access and Accommodation Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 08/19/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/19/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/19/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01333
Permit Description: PRJ300709-1 Cox to bore 488' to install new conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/10/2025 | TRSP - ROW - Field Change Request | Passed | ||
| 10/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/24/2025 | TRSP - ROW - Final | Passed |