Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
08/12/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bell holes in dirt/blktop front for crews to obtain CP reads on gas facilities

Permit Reviews

Permit Number - TR-UTL-0825-01326
Permit Status: Complete
Permit Description: 2 5x5 bell holes in dirt/blktop front for crews to obtain CP reads on gas facilities
Start Date Submittal Complete Date Status  
08/20/2025 RIGHT-OF-WAY REVIEW v.2 08/20/2025 REQUIRES RESUBMIT Review Details
08/25/2025 RIGHT-OF-WAY REVIEW v.3 08/25/2025 APPROVED Review Details
08/12/2025 RIGHT-OF-WAY REVIEW v.1 08/13/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01326
Permit Status: Complete
Permit Description: 2 5x5 bell holes in dirt/blktop front for crews to obtain CP reads on gas facilities
Total Outstanding Activity Conditions - 4
Date Name
08/25/2025 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
08/25/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
08/25/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
08/25/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0825-01326
Permit Description: 2 5x5 bell holes in dirt/blktop front for crews to obtain CP reads on gas facilities
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/01/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete
12/01/2025 TRSP - ROW - Barricade Takedown Passed Work is complete
12/01/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
12/01/2025 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
10691 E ESMOND STATION RD- FINAL TCP_V1.PDF DOCUMENTS VIEW
HOUGHTON RD AND ESMOND STATION RD SITE PLAN_V1.PDF DOCUMENTS VIEW