Permit: TR-UTL-0825-01318
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
330 W NEBRASKA ST
Address NEW:
330 W NEBRASKA ST
Apply Date:
08/11/2025
Applicant:
Chelsey Bolinger
Description:
P.169078N (KAHNA) – Access of ex HH-9831 for splicing.
Permit Reviews
Permit Number - TR-UTL-0825-01318
Permit Status: Complete
Permit Description: P.169078N (KAHNA) – Access of ex HH-9831 for splicing.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/11/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/12/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01318
Permit Status: Complete
Permit Description: P.169078N (KAHNA) – Access of ex HH-9831 for splicing.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/11/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 08/11/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/12/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/12/2025 | Your project work requires that you contact the Sunnyside Unified School District to alert them and coordinate work as needed in school zones. |
| 08/12/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01318
Permit Description: P.169078N (KAHNA) – Access of ex HH-9831 for splicing.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/03/2025 | TRSP - ROW - Final | Passed |