Permit: TR-UTL-0825-01310
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1680 W IRVINGTON RD
Address NEW:
1680 W IRVINGTON RD
Apply Date:
08/11/2025
Applicant:
Chelsey Bolinger
Description:
P.169078F (KAHNA) – Access of ex MH-19804 for splicing.
Permit Reviews
Permit Number - TR-UTL-0825-01310
Permit Status: Complete
Permit Description: P.169078F (KAHNA) – Access of ex MH-19804 for splicing.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2025 | RIGHT-OF-WAY REVIEW v.2 | 09/09/2025 | APPROVED |
| 08/11/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/28/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01310
Permit Status: Complete
Permit Description: P.169078F (KAHNA) – Access of ex MH-19804 for splicing.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/12/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/12/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/09/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 09/09/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01310
Permit Description: P.169078F (KAHNA) – Access of ex MH-19804 for splicing.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/15/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/15/2025 | TRSP - ROW - Final | Passed |