Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7655 S KOLB RD
Address NEW:
7655 S KOLB RD
Apply Date:
08/07/2025
Applicant:
Cox Communications
Description:
Traffic control / barricade only - PRJ300998-1 COX to overlash for ~820'

Permit Reviews

Permit Number - TR-UTL-0825-01290
Permit Status: Complete
Permit Description: Traffic control / barricade only - PRJ300998-1 COX to overlash for ~820'
Start Date Submittal Complete Date Status  
08/07/2025 RIGHT-OF-WAY REVIEW v.1 08/08/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01290
Permit Status: Complete
Permit Description: Traffic control / barricade only - PRJ300998-1 COX to overlash for ~820'
Total Outstanding Activity Conditions - 4
Date Name
08/08/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/08/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
08/08/2025 Traffic control set-up approved between 9AM - 3:30PM
08/08/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0825-01290
Permit Description: Traffic control / barricade only - PRJ300998-1 COX to overlash for ~820'
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/16/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I have spoke with Kevin Young multiple times from Optimum. He is well aware of the city of Tucson standards and practices.
09/22/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete
09/22/2025 TRSP - ROW - AERIAL INSTALLATION Passed Work is complete
09/26/2025 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
BI-702068_PRJ300998-1_TPD SUBSTATION 7655 S KOLB RD TCP_V1.PDF DOCUMENTS VIEW
PRJ300998-1 PLANS_V1.PDF DOCUMENTS VIEW