Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5858 S MORRIS BL
Address NEW:
5858 S MORRIS BL
Apply Date:
08/06/2025
Applicant:
Chelsey Bolinger
Description:
P.169113A (KAHNA) - BORE 614’ & TRENCH 171’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (10) HANDHOLES & PEDESTALS. OVERLASH 3,472’ OF AERIAL FIBER CABLE.

Permit Reviews

Permit Number - TR-UTL-0825-01282
Permit Status: Complete
Permit Description: P.169113A (KAHNA) - BORE 614’ & TRENCH 171’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (10) HANDHOLES & PEDESTALS. OVERLASH 3,472’ OF AERIAL FIBER CABLE.
Start Date Submittal Complete Date Status  
08/07/2025 RIGHT-OF-WAY REVIEW v.1 08/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0825-01282
Permit Status: Complete
Permit Description: P.169113A (KAHNA) - BORE 614’ & TRENCH 171’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (10) HANDHOLES & PEDESTALS. OVERLASH 3,472’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 3
Date Name
08/07/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D
08/07/2025 Traffic control set-up approved between 9AM - 3:30PM
08/13/2025 Pavement Moratorium

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0825-01282
Permit Description: P.169113A (KAHNA) - BORE 614’ & TRENCH 171’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (10) HANDHOLES & PEDESTALS. OVERLASH 3,472’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/23/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/24/2025 TRSP - ROW - Barricade - Setup/Routine Passed
11/24/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
11/24/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.169113A AERIAL MAP_V1.PDF DOCUMENTS VIEW
P.169113A_CAD_08062025_V1.PDF DOCUMENTS VIEW
P.169113A_TCP_08062025_V1.PDF DOCUMENTS VIEW