Permit: TR-UTL-0825-01272
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
501 W RIVER RD
Address NEW:
501 W RIVER RD
Apply Date:
08/06/2025
Applicant:
John Rhodes
Description:
Tie point will be existing underground plant at existing doghouse. Bore 215' of two 2" conduits at a depth of 3'. Run 215' of .625 coax and place new pedestal. Trench 250' of 2" conduit at a depth of 3'. Run 250' of .625 coax cable and place a new pedestal. Proof 150' of existing conduit and run 150' of .625 coax cable. Permit update 9/19/2025: Renewal request for 30 days as of 9/24/2025.
Permit Reviews
Permit Number - TR-UTL-0825-01272
Permit Status: Complete
Permit Description: Tie point will be existing underground plant at existing doghouse. Bore 215' of two 2" conduits at a depth of 3'. Run 215' of .625 coax and place new pedestal. Trench 250' of 2" conduit at a depth of 3'. Run 250' of .625 coax cable and place a new pedestal. Proof 150' of existing conduit and run 150' of .625 coax cable.
Permit update 9/19/2025: Renewal request for 30 days as of 9/24/2025.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 09/30/2025 | REQUIRES RESUBMIT |
| 08/11/2025 | RIGHT-OF-WAY REVIEW v.2 | 08/11/2025 | REQUIRES RESUBMIT |
| 08/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/08/2025 | REQUIRES RESUBMIT |
| 08/13/2025 | RIGHT-OF-WAY REVIEW v.3 | 08/13/2025 | APPROVED |
| 10/10/2025 | RIGHT-OF-WAY REVIEW REVISION v.3 | 10/10/2025 | APPROVED |
| 10/09/2025 | RIGHT-OF-WAY REVIEW REVISION v.2 | 10/09/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0825-01272
Permit Status: Complete
Permit Description: Tie point will be existing underground plant at existing doghouse. Bore 215' of two 2" conduits at a depth of 3'. Run 215' of .625 coax and place new pedestal. Trench 250' of 2" conduit at a depth of 3'. Run 250' of .625 coax cable and place a new pedestal. Proof 150' of existing conduit and run 150' of .625 coax cable.
Permit update 9/19/2025: Renewal request for 30 days as of 9/24/2025.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/06/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/06/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/13/2025 | Additional work effecting Right of way not covered within existing Traffic control will require submission of additional plans |
| 08/13/2025 | Approved for Work within City of Tucson Right of Way Only.. ADOT permits will be required for work in and Traffic Control within ADOT ROW |
| 08/13/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/13/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0825-01272
Permit Description: Tie point will be existing underground plant at existing doghouse. Bore 215' of two 2" conduits at a depth of 3'. Run 215' of .625 coax and place new pedestal. Trench 250' of 2" conduit at a depth of 3'. Run 250' of .625 coax cable and place a new pedestal. Proof 150' of existing conduit and run 150' of .625 coax cable.
Permit update 9/19/2025: Renewal request for 30 days as of 9/24/2025.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/29/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/24/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/24/2025 | TRSP - ROW - Final | Passed |