Permit: TR-UTL-0824-01608
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7981 S FARMVIEW PL
Address NEW:
7981 S FARMVIEW PL
Apply Date:
08/27/2024
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
PRJ276534-2-Cox to place 1 new vault location, and will bore total 158ft East , moving into private property.
Permit Reviews
Permit Number - TR-UTL-0824-01608
Permit Status: Complete
Permit Description: PRJ276534-2-Cox to place 1 new vault location, and will bore total 158ft East , moving into private property.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/27/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/03/2024 | REQUIRES RESUBMIT |
| 09/06/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01608
Permit Status: Complete
Permit Description: PRJ276534-2-Cox to place 1 new vault location, and will bore total 158ft East , moving into private property.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/29/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/29/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01608
Permit Description: PRJ276534-2-Cox to place 1 new vault location, and will bore total 158ft East , moving into private property.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | traffic control set up not witnessed, all work complete site closed | |
| 11/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Area covered in adjacent permit pre-con with Rich and Travis Horness | |
| 11/12/2024 | TRSP - ROW - Barricade Takedown | Passed | all traffic control removed, site complete | |
| 11/12/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | no impact to Hardscape or asphalt, landscape properly restored and approved | |
| 11/12/2024 | TRSP - ROW - Final | Passed | all inspections passed, site completed |