Permit: TR-UTL-0824-01589
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3302 S CHESIN DR
Address NEW:
3302 S CHESIN DR
Apply Date:
08/22/2024
Applicant:
Desert Barricades LLC
Description:
WO T91444 - Memo 21-09 - Revision 1 (Sub-phase 1.6). Replace (7) transformers and replace 2,197’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance.
Permit Reviews
Permit Number - TR-UTL-0824-01589
Permit Status: Complete
Permit Description: WO T91444 - Memo 21-09 - Revision 1 (Sub-phase 1.6). Replace (7) transformers and replace 2,197’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/28/2024 | REQUIRES RESUBMIT |
| 09/20/2024 | RIGHT-OF-WAY REVIEW v.3 | 09/20/2024 | APPROVED |
| 08/28/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/11/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01589
Permit Status: Complete
Permit Description: WO T91444 - Memo 21-09 - Revision 1 (Sub-phase 1.6). Replace (7) transformers and replace 2,197’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/26/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 08/26/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 08/26/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/26/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01589
Permit Description: WO T91444 - Memo 21-09 - Revision 1 (Sub-phase 1.6). Replace (7) transformers and replace 2,197’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Ramey, phase will likely last till 1/10. Reviewed traffic control(likely not needed.) | |
| 03/21/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work on this permit is now complete. A barricade traffic control set up inspection was never requested. | |
| 03/21/2025 | TRSP - ROW - Barricade Takedown | Passed | All traffic control has been removed from the job site | |
| 03/21/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | All overhead work was completed within specifications | |
| 03/21/2025 | TRSP - ROW - Final | Passed | Work is now complete and area has been cleaned. |