Permit: TR-UTL-0824-01587
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7102 E PORTLAND DR
Address NEW:
7102 E PORTLAND DR
Apply Date:
08/22/2024
Applicant:
Desert Barricades LLC
Description:
WO T91443 - Memo 21-09 - Revision 1 (Sub-phase 1.4). Replace (9) transformers and replace 2,272’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance. 12/6/24- RENEWAL FOR 90 DAYS ISSUED
Permit Reviews
Permit Number - TR-UTL-0824-01587
Permit Status: Complete
Permit Description: WO T91443 - Memo 21-09 - Revision 1 (Sub-phase 1.4). Replace (9) transformers and replace 2,272’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance.
12/6/24- RENEWAL FOR 90 DAYS ISSUED
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/23/2024 | REQUIRES RESUBMIT |
| 08/28/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01587
Permit Status: Complete
Permit Description: WO T91443 - Memo 21-09 - Revision 1 (Sub-phase 1.4). Replace (9) transformers and replace 2,272’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance.
12/6/24- RENEWAL FOR 90 DAYS ISSUED
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/23/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 08/23/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01587
Permit Description: WO T91443 - Memo 21-09 - Revision 1 (Sub-phase 1.4). Replace (9) transformers and replace 2,272’ of single-phase primary. No ground disturbance or civil work to be done, only replacing like for like UG equipment, and performing aerial maintenance.
12/6/24- RENEWAL FOR 90 DAYS ISSUED
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Area covered with pre-con meeting on 12/12 with Ramey | |
| 03/17/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete on this job, the permit is now expired, I know traffic control inspection was ever requested. | |
| 03/17/2025 | TRSP - ROW - Barricade Takedown | Passed | All traffic control has been removed from the job site | |
| 03/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All work on this project was either replacement of existing devices or overhead installation. Therefore no backfill or compaction inspection was needed. | |
| 03/17/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | Work appears to be complete, the permit is now expired, and the overhead installation inspection was never requested. | |
| 03/17/2025 | TRSP - ROW - Final | Passed | Work is complete and permit is now expired |