Permit: TR-UTL-0824-01582
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1101 S VAN BUREN AV
Address NEW:
1101 S VAN BUREN AV
Apply Date:
08/22/2024
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing 1" water service with 1" water meter and 4" fire protection service Permit update 9/27/2024: Renewed for 30 days.
Permit Reviews
Permit Number - TR-UTL-0824-01582
Permit Status: Complete
Permit Description: Installing 1" water service with 1" water meter and 4" fire protection service
Permit update 9/27/2024: Renewed for 30 days.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01582
Permit Status: Complete
Permit Description: Installing 1" water service with 1" water meter and 4" fire protection service
Permit update 9/27/2024: Renewed for 30 days.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/22/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 08/22/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01582
Permite Description: Installing 1" water service with 1" water meter and 4" fire protection service
Permit update 9/27/2024: Renewed for 30 days.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2024 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01582
Permit Description: Installing 1" water service with 1" water meter and 4" fire protection service
Permit update 9/27/2024: Renewed for 30 days.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/01/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/03/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 07/21/2025 | TRSP - ROW - Final | Passed |