Permit: TR-UTL-0824-01574
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
810 E BENSON HY BLDG 1
Address NEW:
810 E BENSON HY BLDG 1
Apply Date:
08/21/2024
Applicant:
Cox Communications
Description:
Cox to do a straight pole transfer (2) & pothole to transfer riser (1) for service repair order.
Permit Reviews
Permit Number - TR-UTL-0824-01574
Permit Status: Complete
Permit Description: Cox to do a straight pole transfer (2) & pothole to transfer riser (1) for service repair order.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01574
Permit Status: Complete
Permit Description: Cox to do a straight pole transfer (2) & pothole to transfer riser (1) for service repair order.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/21/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/21/2024 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 08/21/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/21/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01574
Permit Description: Cox to do a straight pole transfer (2) & pothole to transfer riser (1) for service repair order.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/06/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/10/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/10/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 10/18/2024 | TRSP - ROW - Final | Passed |