Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0824-01562
Permit Details
Apply Date:
08/20/2024
Applicant:
Bernardo Felix
Description:
Crew to perform maintenance work on small cell light poles, replacing existing radio with like for like
Permit Reviews
Permit Number - TR-UTL-0824-01562
Permit Status: Complete
Permit Description: Crew to perform maintenance work on small cell light poles, replacing existing radio with like for like
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01562
Permit Status: Complete
Permit Description: Crew to perform maintenance work on small cell light poles, replacing existing radio with like for like
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
08/21/2024 | Traffic Control set-up approved between 7AM - 5PM |
08/21/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
08/23/2024 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
08/23/2024 | Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01562
Permit Description: Crew to perform maintenance work on small cell light poles, replacing existing radio with like for like
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/30/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/27/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
09/30/2024 | TRSP - ROW - Final | Passed |