Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7547 E HAMPTON PL
Apply Date:
08/20/2024
Applicant:
Andrea Charles
Description:
Trenching ped to ped at a depth of 24 inches, placing a 2 inch conduit and running .625 cable

Permit Reviews

Permit Number - TR-UTL-0824-01548
Permit Status: Complete
Permit Description: Trenching ped to ped at a depth of 24 inches, placing a 2 inch conduit and running .625 cable
Start Date Submittal Complete Date Status  
08/20/2024 RIGHT-OF-WAY REVIEW v.1 08/21/2024 REQUIRES RESUBMIT Review Details
08/21/2024 RIGHT-OF-WAY REVIEW v.2 08/21/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0824-01548
Permit Status: Complete
Permit Description: Trenching ped to ped at a depth of 24 inches, placing a 2 inch conduit and running .625 cable
Total Outstanding Activity Conditions - 3
Date Name
08/20/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
08/20/2024 Traffic Control set-up approved between 7AM - 5PM
08/21/2024 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0824-01548
Permite Description: Trenching ped to ped at a depth of 24 inches, placing a 2 inch conduit and running .625 cable
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/01/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0824-01548
Permit Description: Trenching ped to ped at a depth of 24 inches, placing a 2 inch conduit and running .625 cable
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/01/2024 TRSP - ROW - Barricade - Setup/Routine Passed
10/01/2024 TRSP - ROW - Barricade Takedown Passed
10/01/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
10/02/2024 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1110582 - 7547 E HAMPTON PL 08192024_V1.PDF DOCUMENTS VIEW
CITY OF TUCSON-1615472 SR1110582_V1.PDF DOCUMENTS VIEW
WYCO FIELD - 7547 E HAMPTON PL - ALLEY CL - 1615472_V2.PDF DOCUMENTS VIEW