Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4410 S PARK AV
Address NEW:
4410 S PARK AV
Apply Date:
08/15/2024
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing 2" water service with 2" potable water meter and 6" fire protection service

Permit Reviews

Permit Number - TR-UTL-0824-01525
Permit Status: Complete
Permit Description: Installing 2" water service with 2" potable water meter and 6" fire protection service
Start Date Submittal Complete Date Status  
08/15/2024 RIGHT-OF-WAY REVIEW v.1 08/16/2024 REQUIRES RESUBMIT Review Details
09/03/2024 RIGHT-OF-WAY REVIEW v.2 09/03/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0824-01525
Permit Status: Complete
Permit Description: Installing 2" water service with 2" potable water meter and 6" fire protection service
Total Outstanding Activity Conditions - 3
Date Name
08/16/2024 Traffic control set-up approved between 9AM - 3:30PM
08/16/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/16/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0824-01525
Permit Description: Installing 2" water service with 2" potable water meter and 6" fire protection service
Total Completed Inspections - 6
Date Description Inspector Results Comments
09/18/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/08/2024 TRSP - ROW - Barricade Takedown Passed
11/08/2024 TRSP - ROW - Barricade - Setup/Routine Passed work already completed, traffic control taken down
11/12/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
11/19/2024 TRSP - ROW - SITE INSPECTION Passed
02/28/2025 TRSP - ROW - Final Passed