Permit: TR-UTL-0824-01511
Permit Details
Apply Date:
08/14/2024
Applicant:
Cox Communications
Description:
PRJ277058-1 From TEP pole near 5002 S. Greenway Dr. add 100' of 144ct fiber to tie to existing storage cases and riser down pull through approx 2000' of new fiber through existing conduit, place (2) 4x4' potholes and (2) new 2x3' vaults, remove (1) existing ped and replace with 24x42x24 ped.
Permit Reviews
Permit Number - TR-UTL-0824-01511
Permit Status: Issued
Permit Description: PRJ277058-1 From TEP pole near 5002 S. Greenway Dr. add 100' of 144ct fiber to tie to existing storage cases and riser down pull through approx 2000' of new fiber through existing conduit, place (2) 4x4' potholes and (2) new 2x3' vaults, remove (1) existing ped and replace with 24x42x24 ped.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01511
Permit Status: Issued
Permit Description: PRJ277058-1 From TEP pole near 5002 S. Greenway Dr. add 100' of 144ct fiber to tie to existing storage cases and riser down pull through approx 2000' of new fiber through existing conduit, place (2) 4x4' potholes and (2) new 2x3' vaults, remove (1) existing ped and replace with 24x42x24 ped.
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
08/14/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
08/14/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
08/14/2024 | Traffic Control set-up approved between 7AM - 5PM |
08/14/2024 | Traffic control set-up approved between 9AM - 3:30PM |
08/14/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
08/14/2024 | Pre-activity meeting to be scheduled thought TDC portal and held prior to start of work, with inspections team |