Permit: TR-UTL-0824-01504
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2547 S AZTEC POINT TR
Address NEW:
2547 S AZTEC POINT TR
Apply Date:
08/13/2024
Applicant:
Judy Boyer
Description:
2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Permit Reviews
Permit Number - TR-UTL-0824-01504
Permit Status: Complete
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/13/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01504
Permit Status: Complete
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/13/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 08/13/2024 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/13/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01504
Permite Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | awaiting density reports |
| 10/16/2024 | TRSP - ROW - Final | N/A | Not Ready | awaiting backfill density reports |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01504
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/16/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | no setup witnessed, job completed | |
| 10/16/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | 50’ patch flush with existing pavement | |
| 10/16/2024 | TRSP - ROW - Barricade Takedown | Passed | all traffic control removed | |
| 08/15/2025 | TRSP - ROW - Final | Passed | Old permit, work is complete |