Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3300 E NAVAJO PL
Address NEW:
3300 E NAVAJO PL
Apply Date:
08/08/2024
Applicant:
Judy Boyer
Description:
2 5x5 bell holes in blktop/dirt for crews to pothole gas line

Permit Reviews

Permit Number - TR-UTL-0824-01484
Permit Status: Complete
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Start Date Submittal Complete Date Status  
08/08/2024 RIGHT-OF-WAY REVIEW v.1 08/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0824-01484
Permit Status: Complete
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Outstanding Activity Conditions - 4
Date Name
08/08/2024 Traffic Control set-up approved between 7AM - 5PM
08/08/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/08/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
08/08/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0824-01484
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Completed Inspections - 8
Date Description Inspector Results Comments
08/13/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/09/2024 TRSP - ROW - Barricade - Setup/Routine Passed work already completed, traffic control plan followed
10/09/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed no paving needed, only potholing in dirt area
10/09/2024 TRSP - ROW - Barricade Takedown Passed
10/09/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
10/09/2024 TRSP - ROW - Final Passed
10/09/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed no concrete work needed, utility potholes in dirt area
10/09/2024 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed No concrete work needed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
3300 E NAVAJO PL N EDITH BLVD AND E FORT LOWELL PL_V1.PDF DOCUMENTS VIEW
N EDITH BLVD AND E FORT LOWELL PL_V1.PDF DOCUMENTS VIEW