Permit: TR-UTL-0824-01472
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1300 W GLENN ST
Address NEW:
1300 W GLENN ST
Apply Date:
08/07/2024
Applicant:
Desert Barricades LLC
Description:
WO 6346331 - TEP Grounding replacement Phase 1 (Original permit TR-UTL-0224-00268)
Permit Reviews
Permit Number - TR-UTL-0824-01472
Permit Status: Complete
Permit Description: WO 6346331 - TEP Grounding replacement Phase 1 (Original permit TR-UTL-0224-00268)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/12/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/15/2024 | APPROVED |
| 08/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/08/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01472
Permit Status: Complete
Permit Description: WO 6346331 - TEP Grounding replacement Phase 1 (Original permit TR-UTL-0224-00268)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/12/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/12/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01472
Permit Description: WO 6346331 - TEP Grounding replacement Phase 1 (Original permit TR-UTL-0224-00268)
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/18/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 11/18/2024 | TRSP - ROW - Final | Passed |