Permit: TR-UTL-0824-01439
Permit Details
Apply Date:
08/01/2024
Applicant:
DOONE BAKER
Description:
P.067197F (KAHNA) – BORE 5,022' & TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (33) HANDHOLES & (9) PEDESTALS.
Permit Reviews
Permit Number - TR-UTL-0824-01439
Permit Status: Issued
Permit Description: P.067197F (KAHNA) – BORE 5,022' & TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (33) HANDHOLES & (9) PEDESTALS.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01439
Permit Status: Issued
Permit Description: P.067197F (KAHNA) – BORE 5,022' & TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (33) HANDHOLES & (9) PEDESTALS.
Total Outstanding Activity Conditions - 8
Date | Name |
---|---|
08/02/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
08/02/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
08/02/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
08/02/2024 | Traffic Control set-up approved between 7AM - 5PM |
08/02/2024 | Traffic control set-up approved between 9AM - 3:30PM |
08/02/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
08/02/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
08/02/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanos@tucsonaz.gov or James Degrood at James.degrood@tucsonaz.gov prior to start of work |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0824-01439
Permit Description: P.067197F (KAHNA) – BORE 5,022' & TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (33) HANDHOLES & (9) PEDESTALS.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/11/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Area covered in permit E pre-con on 11/7 |