Permit: TR-UTL-0823-02380
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8501 E BROADWAY BL
Address NEW:
8501 E BROADWAY BL
Apply Date:
08/29/2023
Applicant:
National Barricade LLC.
Description:
PLEASE EXPIDITE, OWNER IS REPAVING PARKING LOT SOON. EXCAVATING A 10X3 TRENCH AT 8501 E BROADWAY BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF WEST P/L AND 9' SOUTH OF POWER POLE. SEE SITE PLAN
Permit Reviews
Permit Number - TR-UTL-0823-02380
Permit Status: Complete
Permit Description: PLEASE EXPIDITE, OWNER IS REPAVING PARKING LOT SOON. EXCAVATING A 10X3 TRENCH AT 8501 E BROADWAY BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF WEST P/L AND 9' SOUTH OF POWER POLE. SEE SITE PLAN
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/29/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0823-02380
Permit Status: Complete
Permit Description: PLEASE EXPIDITE, OWNER IS REPAVING PARKING LOT SOON. EXCAVATING A 10X3 TRENCH AT 8501 E BROADWAY BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF WEST P/L AND 9' SOUTH OF POWER POLE. SEE SITE PLAN
| Date | Description | Comments |
|---|---|---|
| 08/29/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 08/29/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0823-02380
Permit Description: PLEASE EXPIDITE, OWNER IS REPAVING PARKING LOT SOON. EXCAVATING A 10X3 TRENCH AT 8501 E BROADWAY BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF WEST P/L AND 9' SOUTH OF POWER POLE. SEE SITE PLAN
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/15/2023 | TRSP - ROW - Recurring | Passed | ||
| 11/15/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |